Make a surface map of the house
Walk around from safe ground level and photograph each elevation. Mark which areas are already painted, what the underlying material is and where the finish looks damaged. Leave high or inaccessible areas for a contractor's survey.
| Area | Find out before buying paint |
|---|---|
| Timber siding or trim | Is the wood sound, what caused the failed finish and which preparation and primer suit it? |
| Masonry or render | Is coating appropriate for this material and its condition, and are repairs or drying needed first? |
| Metal railings or trim | What metal is it, what corrosion is present and which compatible system is specified? |
| Factory-finished siding | Does the manufacturer allow repainting, and which coatings and colours are approved? |
Keep a separate line for the front door, window trim and any outbuilding. They may look like part of one colour scheme while needing different products. Ask for written product names and data sheets, not just “exterior white.”
Put repairs and lead checks before paint removal
If paint keeps failing in one place, show that pattern to the contractor. Note nearby leaking gutters, visibly damaged joinery or other moisture concerns. Ask who will identify and correct the cause before the area is covered again. Do not use fresh paint as the diagnosis.
For a US home built before 1978, check for lead before disturbing old coatings. EPA says renovation and painting work can create dangerous lead dust and recommends hiring a lead-safe certified contractor. Its guidance also covers homes whose age cannot be determined. Avoid casual dry-sanding or scraping while that question is unresolved.
EPA's lead-safe renovation pamphlet was updated in March 2026. Use the current guidance and the rules for your location. Outside the US, ask the relevant local authority or qualified specialist how old paint should be assessed and handled.
Check access at the same time. Upper walls, awkward ground and work over entrances belong in a safe-access plan. If you are hiring the work out, ask whether access equipment and protection of paths and planting are included.
Use a preparation order that matches the coating system
Sherwin-Williams describes a properly prepared exterior surface as clean, solid and dry. Its homeowner guidance recommends testing the proposed system on an inconspicuous area and checking for compatibility or adhesion problems after the stated drying time.
Once the surface and any hazardous coating issues have been assessed, use the product instructions to build the work sequence:
- Repair: complete agreed material repairs and allow any specified curing or drying.
- Clean and prepare: use a method suitable for the surface and any existing coating. Plan containment and waste handling where needed.
- Prime: identify which bare, patched or stained areas need the specified primer. Do not assume a finish described as paint and primer replaces every preparation step.
- Apply the finish: use the specified number of coats and observe the recoat interval.
- Check the result: inspect the agreed areas and record products used before packing everything away.
That list sets the order; it does not supply one cleaning chemical, sanding method or primer for the entire house. If the instructions conflict with the existing material or coating, resolve the question with the manufacturer or contractor first.
Plan around the product's weather limits
Read the data sheet for air and surface temperature, moisture conditions, recoat time and the period needed before rain. Check the forecast against those conditions for the part of the house being painted, rather than choosing a date because the afternoon looks sunny.
Sherwin-Williams' general preparation page warns against painting just after rain, in fog or when rain is expected. It also notes that products designed for particular conditions can have different temperature limits. The instructions for your exact coating govern the job.
For example, if preparation runs late, the remaining dry window may no longer cover both coating and the required rain-free period. Reassess the schedule instead of squeezing the last coat in. Ask a contractor how weather delays affect the completion plan.
Calculate coverage from measured areas
Measure the areas to be coated and use the coverage figure for the exact product and surface. Record primer separately from the finish. Check whether the supplier's figure is per coat and whether rough or absorbent surfaces need a different allowance.
Illustrative calculation: if an area is 20 square metres and the chosen product's instructions give 5 square metres per litre per coat, two coats require 20 ÷ 5 × 2 = 8 litres before any project-specific allowance.
Use the pack sizes and guidance for the real job before ordering. Do the calculation for trim and doors separately if they use another product. Keep spare paint only in line with its storage and disposal instructions, with the colour and surface clearly labelled.
Test colour beside the parts that stay
Choose samples beside the roof, brickwork, stone, paths and existing window frames. Look from across the street as well as close up, and compare them in sun and shade. A colour that suits a small swatch can behave differently beside a large fixed surface.
Use the sampling method specified by the manufacturer. Decide on sheen as well as colour; avoid relying on a digital mock-up as your only check. If the house has protected status or is subject to association rules, establish what permission is needed before ordering.
Give the contractor a marked surface map, agreed repairs, product names, colours and exclusions. Save the final schedule with photographs of the finished job. Our traditional exterior guide helps you decide which smaller changes deserve attention before a whole-house repaint.
More for your home and garden
- Large Home Windows: Compare Light, Ventilation and Maintenance
- Roof Storm Damage: What to Check and Who Should Repair It
- Updating a Traditional Home Exterior: Six Practical Options
Sources and further reading
A LITTLE MORE FROM NANCY
Nancy
Find something good to cook, get a small garden started or pick up a useful idea for your home.
Meet Nancy